Development Task Estimation
Something to Keep in Mind
Please note that estimations should be made with the newest members in mind. How long do you think it would take them to complete the task vs your own personal estimation.
PS estimation Tool + Charging for Estimation
Starting January 1st 2023, we will use the ps-tool to estimate tasks and provide a deliverable outline for the customer/BSA when we give the estimate.
As the PSUS team, we will also charge the customer for any time taken to do the estimate. This means the analysis time will be logged directly on the development task even before it is approved. If the customer wants an estimate, they will need to use pack hours. The task must have at least 10 hours to begin the estimation, the project leader will check for this first. This also means that we must be more precise when we are doing the estimation. There is much less room for error since we will be using pack hours to estimate the task.
Watch this video on the demo Ali did for the ps-tool.
If you do not have access to the tool here: PS-Tool, please reach out to JAM.
Base Estimation
Type | Hours | Notes |
---|---|---|
Compute Field | 2+ | Includes associated method(s) |
Non-compute Field | 1+ | |
New PDF Report | 8+ | |
Labels (printed) | 8+ | Depends on complexity. |
Financial Report (SQL/HTML) | 16-24 | New or Modifying |
Views: Form/List | 2 | |
Views: Graph/etc | 4 | |
Views: Gantt/Calendar/Kanban | 6+ | Might involve Javascript |
Cron(Server Action) | 8 | Each |
Statistical View | 20 | Each |
Mexican Addenda | 4-12+ | |
Smart Button | 2+ | Per Button |
Constraint | 2+ |
Business Logic
A lot of business logic really depends on your own judgment. Here are some general estimates for common development:
Type | Hours | Notes |
---|---|---|
Methods(overloading | 2+ | |
Controllers | 4+ | |
JS Class | 6+ | |
JS Widget | 12+ |
Security
Type | Hours | Notes |
---|---|---|
Group | 1 | New or Existing |
Record Rules | 2 | |
Access Rights | 1 |
Data Import(Script)
Type | Hours | Notes |
---|---|---|
Object | 8 | |
Sub-Object | 4 |
Data Deletion/Cleanup(Script)
Type | Hours | Notes |
---|---|---|
Object | 4 | Per Object |
EDI (TALK TO BMU/DIPA)
Type | Hours | Notes |
---|---|---|
SFTP/FTP | X | Depends on the provider for the SFTP/FTP |
Model (Document) Export/Import | X | |
Testing EDI | X | for back and forth testing, depending on how many docs, number of trading partners etc. |
Other
Type | Hours | Notes |
---|---|---|
Delivery Carrier | 80+ | |
Payment Acquirer | 80+ | |
API connector | 40+ | Really depends on the API and functionality customer requests, might be way more than 40 |
SSO/O-Auth 2.0/Other Auth | 18 |
Unit Testing and UAT Testing
Starting November 1st 2022, we began adding a 20% increase on top of all estimates. This increase is added on top of the general estimation of the task.
This time is used to account for writing python Unit Tests and making sure the development branch is green in SH. Also accounts for any time needed to create documentation for the customer or recording any UAT videos for them as well.
Formulas
General Formula
LOC Total = ⌈(Estimate Hours + 20% of Estimate Hours) * (Lines of Code per Hour)⌉
Line of Cost Total is equal to the Ceiling(to the nearest 100) of Lines of Code per Hour multiplied by Estimated Hours.
Note: All Estimated hours should be rounded up to the nearest Even Ceiling value(3 Hours rounded to 4 hours)
Example:
Base Estimate = 7
Total Estimate = ⌈7 + 7*(.2)⌉ Hours = ⌈7 + 1.4⌉ Hours = ⌈8.4⌉ Hours = 10 Hours
LOC per Hour = 16
LOC Total = ⌈10 * 16⌉ = 200 LOC
On SH
Type | Line of Code per Hour | Notes |
---|---|---|
Models/Fields/Views | 16 | |
JS/Website/CSS/SASS/API/ PoS/Dashboard | 28 | |
API/EDI | 28 |
SaaS
Note: Remember that only QWeb related Requests and Mexico Addendas are allowed on Saas databases, otherwise the customer will need an Odoo owned SH.
Type | Line of Code per Hour | Notes |
---|---|---|
Any | 36 |
Branding
We do not completely de-brand an Odoo database. Note: Removing the phrase “Powered By Odoo” is the only exception.
Estimation Reliability
Each estimation has an estimation reliability (how strong you feel about the estimate). Default is 70% reliable.
For example 70% reliability means that the hours the developer takes on the actual task may vary +/- 30% of the original estimate. In the case of a 10 hour development estimate, if the task goes over by 3 hours or is under by 3 hours, that is within our initial estimate and we will not refund the 3 hours over if the customer asks.
If you don’t have enough data for estimation, you should adjust the percentage to what you feel should be. Top reliability is 90%, in this case you are very sure it will be done within the estimated hours. Anything below 50% reliability needs to get a second opinion.
If estimates are requested verbally, there is no reliability as it is void unless it’s written down. Always ask the BSA to make the task first.
Presales Estimates
When a development is sold with a Subscription and Success Pack, a Presales Estimate can have been given. The pre-sales consulting team separates out functionality that can be done with Odoo out of the box from items that will need development. An estimate is given for the items that need development, which can be very general based on the details provided.
These estimates can be used as a guideline, but specs may have changed when the BSA creates a development task. Make sure to double-check that the estimate is correct or if additional/fewer hours are needed based on the final requirements. Reach out to the pre-sales team to sync up on any questions.
Other Considerations
Hourly estimates are not necessarily additive in terms of time, but you can combine them to give an average time to do them in bulk, ie, if you are adding multiple fields it won’t take each field 1h to implement. In other words, these values are just a baseline.
This section should be a little less relevant, as we are using the ps tool now which gives a more specific break down, but things like testing or set up/pushing code can be lumped together still. Remember you can always add more sections to the ps tool breakdown and manually change or set anything you need.
- Estimations include start-to-finish stages of development:
- Reading spec
- Setting local env
- Doing dev on local
- Pushing code on GH
- Preparing dev/staging branches
- Testing on dev/staging
- Sending to customer
As a precautionary measure, if your estimate is 40h+, get a second opinion from another team member.
Giving the Estimate
Format
Follow the Format
[Trigram] 00:00 Hours (~ X LOC / Odoo Managed SH Required/Not Required)
…
…
…
Technical Notes:
*general direction/functions/workflow for developer to follow/get started*
Example:
[JOT] 24:00 Hours (~500 LOC/ Odoo Managed SH Required)
…
…
…
Technical Notes:
1. [1 hr] Inherit _get_columns_name() in account_followup/models/account_followup_report.py to remove Source Document column header and rename the others
2. [2 hr] Inherit _get_lines() in same file to remove source document column in each line
3. [1 hr] Setup and testing
Where do I timesheet doing estimates?
Starting January 1st 2023, we now timesheet all the time spent on Analysis(working on the estimate) on the task itself.
Estimation Steps:
- Pick a Gray task from the Tech Review Stage.
- If the task is already assigned, that means someone else is already working/worked on it.
- Assign yourself to the Development Task
- Check that Reviewer, Parent Task, Sale Order Item, and Subscription Fields are filled out.
- If not, ask the BSA to fill them out before giving the final estimate.
- Or you can fill it out yourself if it’s quick, and you are certain they are the right values.
- Use this Guide to do an Estimation + PS tool.
- Use the New ps-tool to do the estimation
- https://ps-tools.odoo.com/web#cids=4&home=
- Video recording of how to use the tool by AAL - Team Meeting
- https://drive.google.com/file/d/19OjIDF5pjvENwgF3uDY-9LKDdEt-f2OE/view
- Use the New ps-tool to do the estimation
- Calculate the LOC with the formula(see formula section above in this doc).
- Note if the development Requires an Odoo Managed SH project or if Saas is okay.
- Remember: Only QWeb and Mexican Addendas are allowed on Saas database. Otherwise, SH is required.
- Put the Estimate line in the description of the Development Request Task under the text “Planned Hours:”.
- Copy the Analysis section from the Estimation Tool
- This should have a breakdown of the different fields/views/business flows/etc. already generated by the tool
- Set the Allocated Hours and Estimation Reliability Fields in the of the task.
- Allocated Hours should include Estimation time + Analysis time you spent on the task
- Example: 20 hour dev estimate + 2 hour analysis = 20 hour Allocated Hours
- Keep the task in the Kanban Stage “Tech Review” and mark the Kanban color to Green.
- AAL/CIC will review the estimate and let you know if any changes need to be made.
- Project Lead will Log a note with the template “LN01”.
- Do NOT move any tasks in the Tech Review Kanban stage
- If a task needs to be canceled, ping AAL and he will move it
Estimation Customer Approved Steps:
- AAL/CIC will be the only ones moving tasks to Planning, do NOT move any task out of scoping.